Find Us On Facebook View Our LinkedIn Profile Follow Us on Twitter You Tube Google+
PRODUCT CATALOG CUSTOMER SUPPORT ABOUT US EVENTS & E-NEWS MARATHON MAXCELL SEG VIKIMATIC WHITE SANDS
SITE SEARCH
PRODUCT CATALOG
Search Within Results ...
 
BROADBAND PRODUCTS
COAXIAL CABLE
CONDUIT & INNERDUCT
CONDUIT MATRIX
POLYETHYLENE MATRIX
BENDS MATRIX
FITTINGS MATRIX
BORE-GARD & CAN-FUSE
CORRUGATED PVC
FIBERGLASS CONDUIT
FITTINGS AND ACCESSORIES
INNERDUCT
MULTICELL
PVC CONDUIT
SPLIT DUCT
SPLIT STEEL
STEEL PIPE
CONNECTIVITY PRODUCTS
CONNECTORS & HEATSHRINK
DIGITAL SIMULCAST
DIGITAL VOICE
DROP MATERIALS
FIBER OPTICS
FTTX
HARDWARE
HEADEND EQUIPMENT
IP NETWORKING
MARATHON
MAXCELL
METRO ETHERNET
TEST EQUIPMENT
TOOLS & SAFETY EQUIPMENT
TWISTED PAIR
UNDERGROUND EQUIPMENT
ADVANCED SEARCH
MANUFACTURERS
ELECTRONIC CATALOGS
PRODUCT HIGHLIGHTS
OVERSTOCKS & CLOSEOUTS
SOME PRODUCTS PRESENTED IN THIS CATALOG MAY NOT BE AVAILABLE FOR WORLD-WIDE SALE. PLEASE CONTACT YOUR LOCAL TVC REPRESENTATIVE FOR FULL DETAILS.
HOME : PRODUCT CATALOG : CONDUIT & INNERDUCT : PVC CONDUIT

Power & Communication Duct Type DB-60

EMAIL SALES ABOUT THIS PRODUCT
Power & Communication Duct Type DB-60Meets NEMA Standard TC-6 & 8 DB-60/ASTM F-512

RUS Listed

Nonmetallic Power & Communication Duct Type DB is manufactured from an high modulus C-600 compound, developed especially for power and communications applications, and is designed for use in direct burial or concrete encased installations. Type DB is rated for 90°C cable.

Trenching:
Trench should be graded true and free from stones and soft spots. Backfill should also be free of stones and be firmly tamped around the sides of the conduit, to develop maximum supporting strength. Tamping on top of the conduit is not recommended.

Backfill:
In rocky soil where it is impossible to have an even trench bottom, a selected backfill should be put in before laying the conduit. Selected backfill (not tamped) at least 6” over the top of the conduit is recommended. After final backfill is placed, tamping may be used to finish the grade.

The method of direct burial varies with soil condition, load conditions, and engineering preferences. A common practice is to lay one tier at a time, backfill, and repeat with the desired spacing of ducts being made as ducts are layered.

Many companies have used the heavier wall Type DB-120 in a duct-to-duct formation. Where limited loads occur, this type of installation has proven satisfactory.

See Ordering Matrix to configure Part Numbers.
 
Manufacturer.....................: Vikimatic
Specification Data Sheet....: Click Here
 

Ordering Information

Nom. SizeStd. Crate Qty. Approx Wt. Per 100'O.D.Min. Wall
22,800382.375.060
3 2,000813.500.092
3-1/22,0001084.000.107
41,1401334.500.121
57602025.563.152
6520 2886.625.182
 
 
BACK
PRINTER FRIENDLY VERSION
 
HOME ABOUT US CONTACT US PRIVACY POLICY SITE MAP